Vehicle behind schedule? Here’s why:

Whilst efficiency is our priority when we ship a car, unfortunately there are some issues that are out of our control.

But rest assured that the Trans Global Logistics UK Limited team will help to ship a car the best we can!

 

  1. Congestion at ports, often due to a high volume of vehicles and shipments being unloaded. Container shipments sometimes face congestion issues, so it may take a little longer than expected to ship a car.
  2. Customs / documentation, missing or incorrect documents can slow down the process to ship a car, so be sure to provide all the documents required for your shipment to be moved safely and smoothly. What documents do I need? Click here to read about the documents we need to transport your vehicle.
  3. Weather conditions, sometimes nature works against us. We can only do so much to help this one, but we tend to get back on track as quick as possible.
  4. Route disruptions, anything from strikes to geopolitical issues could impact your vehicle shipment.

 

 

By ship a car with Trans Global Logistics UK Limited you can be sure that we are doing everything we can behind the scenes to get your vehicle moved as quickly as possible. With over 30 years of experience, we really are the best people for the job.

 

Contact us:

Website: www.tglog.co.uk

Phone: +44 (0) 7833 410 281

Email: bizdev@tglog.co.uk

Shopping cart

close